Nestavilla - Prefabrik Ev, Hazır Ev, Prefabrik Konut, Prefabrik Yapı, Hazır Konut, Villa Yapı, Pratik ev
NESTAVILLA
CORPORATE
NESTAVILLA
HISTORY
OUR MEANINGS
CERTIFICATES
HUMAN RESOURCES
PRODUCTION PLANTS
SHOWROOM
MEDIA CENTRE
NEWS ABOUT US
 Türkçe /  English /  Русский /  العربية
 
 
NESTAVILLA HOUSE | NESTAVILLA PROFESSIONAL | Corporate | References | Contact
 

Production Plants

Corporate / Production Plants


Vefa Group companies carry out their activities at their production plants situated on an open area of 20.000 m² and a closed area of 15.000 m² at İstanbul Pendik-Kurtköy and Tuzla Organized Industrial Zone (Chemists Industrial Site).

 

Capacity
Vefa offers high-class, economic and fast solutions at its modern production plants. The construction quality is constantly kept under control through the ISO 9001:2000 quality assurance systems. Since majority of the work is performed at the factory, the margin of error remains at minimum level.

Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image
Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image
Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image
Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image Nestavilla Productin Image

The widths and lengths of the prefabricated buildings will be applied in multiples of 125 cm. The prefabricated buildings consist of the modulation of four different panels. The heaviest part of the prefabricated building which is comprised of a filled wall panel, a wall panel with transom window, a wall panel with window and a wall panel with door, is approximately 90 kg.

The panel dimensions are 1250x2500mm1250x2800mm and 1250x3000mm. All architectural projects and static - reinforced concrete and steel calculations are made using SAP2000 and AutoCAD programs, and therefore any changes can be applied easily. Assembly of a single floor building of approximately 100 m2 can be completed within four days.

 

 
Vefa Group Vefa Prefabricated Constructions Steel House, Light Steel, Steel Construction Panel Technologies Construction Profiles

Legal Notice